Update: Upper Greenline 6 Ready for Rebuild
As most everyone knows, the upper section of the Greenline 6 trail was logged in late 2017 and has been largely closed in the interim. We now have light at the end of that tunnel: logging operations are nearing completion and we're ready to start rehabbing the trail. And, FOCF has been retained by the logger to put the trail back in. Here's where we stand. The upper switchbacks are completely intact, trees and all. The 150 yards above the switchbacks (i.e., the drop-in from t